Skip to content.
Home » S&T Documents abstract » 2004 » TC Bảo hộ lao động » Studying to establish the size system of personal protection equipement for protecting head and face areas Studying to establish the size system of personal protection equipement for protecting head and face areas
Local role
Studying to establish the size system of personal protection equipement for protecting head and face areas [Nghiên cứu thiết lập hệ cơ sở cho một số phương tiện bảo vệ vùng đầu, mặt] / Nguyễn Đức Hồng,Cao Duy Tuyết // TC Bảo hộ lao động . -2004. -p. 11-15. -(Vietnamese). -ISSN 0866-8515.
Classification (rubrics)86.23

Key wordsPersonal protection; Protective equipment; Size system; Head; Face; Labour safety;

LocationTVKHKTTW, CTv 34


Print this


Posted news:
Studying to establish the size system of personal protection equipement for protecting head and face areas Tokyo gulf bridge - Application of advanced materials and technologies (16:32 17-12-2008)
Studying to establish the size system of personal protection equipement for protecting head and face areas The success from "Model project for school effective lighting" (16:32 17-12-2008)
Studying to establish the size system of personal protection equipement for protecting head and face areas The situation of construction and urban planning in Federal Republic of Russia (16:32 17-12-2008)
Studying to establish the size system of personal protection equipement for protecting head and face areas Stone paint - preeminent finishing construction material (16:32 17-12-2008)
Studying to establish the size system of personal protection equipement for protecting head and face areas Nam Long Joint-stock Company of Investment: Affirming a strong trademark (16:32 17-12-2008)
Studying to establish the size system of personal protection equipement for protecting head and face areas Model for determining structure deformation (16:32 17-12-2008)
Studying to establish the size system of personal protection equipement for protecting head and face areas Hanoi University of Civil Engineering: The priority purpose is quality and results (16:32 17-12-2008)
Studying to establish the size system of personal protection equipement for protecting head and face areas Making complex-chain work schedule, when single-chain schedule lacking of works or adding-up works on many segments (16:32 17-12-2008)
Studying to establish the size system of personal protection equipement for protecting head and face areas Prevention and resistance to the failure of overlapped joints of flexible end-bearing piles by open-web steel (16:32 17-12-2008)
Studying to establish the size system of personal protection equipement for protecting head and face areas Problem of using carrying-up machines in high-rise building construction (16:32 17-12-2008)
  Introduction
Infoterra Vietnam
NACESTI
You are visitor no: